Official ANTAQ data up to 02/2026
Electrical machinery and equipment: wait and volume by port in Brazil
Last 12 months, deep-sea and coastal shipping (no inland barges). Each ship counts under its heaviest commodity.
- Ships in 12 months
- 96
- Typical wait (median)
- 2.6 h
- Wait for 9 in 10 ships (P90)
- 104 h
- Average handling rate
- 22 t/h
- Tonnes in 12 months
- 77,749
Wait by month of the year
Median over the full ANTAQ series. Months with fewer than 5 ships are left empty.
Historically, the shortest wait is in October (2.2 h) and the longest in March (7.6 h).
View data
| Electrical machinery and equipment | J | F | M | A | M | J | J | A | S | O | N | D |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Med. | 2.6 h | 2.8 h | 7.6 h | 3 h | 3 h | 3.1 h | 2.3 h | 2.3 h | 3 h | 2.2 h | 2.7 h | 3.9 h |
Ports handling this commodity
Only ports with at least 5 ships of this commodity in 12 months.
| Port | Typical wait (median) | P90 | Average handling rate | Ships in 12 months | Tonnes in 12 months |
|---|---|---|---|---|---|
| Itaguaí (RJ) | 2.6 h | 3.8 h | 17.0 t/h | 23 | 13,793 |
| Rio Grande (RS) | 2.9 h | 70.7 h | 25.7 t/h | 22 | 9,154 |
| Santos (SP) | 2.7 h | 105.6 h | 28.8 t/h | 9 | 7,501 |
| Terminal Portuário do Pecém (CE) | 65.8 h | 331.7 h | 9.5 t/h | 6 | 3,681 |
| Teporti (SC) | 2.3 h | 36.4 h | 14.3 t/h | 7 | 3,423 |