Official ANTAQ data up to 02/2026

Waiting time to berth at the Terminal de Granéis Líquidos (TGL) terminal — Aratu (BA)

In the 12 months to 02/2026, vessels waited a median of 27.9 h to berth at the Terminal de Granéis Líquidos (TGL) terminal, Aratu (BA); 1 in 10 waited more than 133.9 h (P90). Based on 269 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 1,185% above the national median for all cargo (2.2 h).

Port complex: Aratu - Salvador

Last 12 months (to 02/2026)

Waiting time to berth — Median
27.9 h
Waiting time to berth — P90
133.9 h
Berthings
269
Operation
30.2 h
Median and P90 wait for all cargo at Terminal de Granéis Líquidos (TGL), by month
MonthMedianP90Berthings
02/202623.3 h99.6 h21
01/202612.0 h76.6 h19
12/202527.9 h207.7 h19
11/202527.7 h158.2 h26
10/202538.0 h179.5 h22
09/202540.0 h123.5 h22
08/202527.2 h191.7 h26
07/202523.2 h66.7 h20
06/202520.2 h108.8 h20
05/20256.7 h46.4 h24
04/202541.7 h175.1 h26
03/202542.1 h137.0 h24

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/aratu/terminais/terminal-de-graneis-liquidos-tgl

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026