Waiting time to berth at the Tecon Sepetiba terminal — Itaguaí (RJ)
In the 12 months to 02/2026, vessels waited a median of 3.4 h to berth at the Tecon Sepetiba terminal, Itaguaí (RJ); 1 in 10 waited more than 4.8 h (P90). Based on 280 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.
The median wait is 56% above the national median for all cargo (2.2 h).
Port complex: Itaguaí
Last 12 months (to 02/2026)
- Waiting time to berth — Median
- 3.4 h
- Waiting time to berth — P90
- 4.8 h
- Berthings
- 280
- Operation
- 17.5 h
| Month | Median | P90 | Berthings |
|---|---|---|---|
| 02/2026 | 3.2 h | 3.9 h | 22 |
| 01/2026 | 3.5 h | 9.3 h | 27 |
| 12/2025 | 3.4 h | 4.3 h | 23 |
| 11/2025 | 3.3 h | 4.4 h | 23 |
| 10/2025 | 3.4 h | 4.1 h | 22 |
| 09/2025 | 3.5 h | 4.6 h | 25 |
| 08/2025 | 3.8 h | 18.4 h | 23 |
| 07/2025 | 3.4 h | 3.9 h | 22 |
| 06/2025 | 3.2 h | 4.0 h | 21 |
| 05/2025 | 3.4 h | 23.3 h | 22 |
| 04/2025 | 3.2 h | 3.7 h | 22 |
| 03/2025 | 3.3 h | 18.7 h | 28 |
How to cite
The data may be reused under the CC BY 4.0 license, citing the source:
Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/itaguai/terminais/tecon-sepetiba
Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026