Port waiting time bulletin — 06/2025

Monthly summary of waiting time to berth at Brazilian ports, built automatically from ANTAQ data.

Brazil: median waiting time: 2.3 h — +10% vs the 12-month average

By cargo

  • Dry bulk: 8.3 h — +15.7% vs the 12-month average
  • Liquid and gas bulk: 6.9 h — +26.8% vs the 12-month average
  • General cargo: 0.2 h — +26.7% vs the 12-month average
  • Container: 3.1 h — -36% vs the 12-month average
  • Other: 12.7 h — +2,438.2% vs the 12-month average

Largest increases in waiting time

  1. Porto Gregório Curvo (MS): 92.6 h — +204.1% vs the 12-month average
  2. Portocel - Terminal Especializado de Barra do Riacho (ES): 17.2 h — +185.7% vs the 12-month average
  3. Vila do Conde (PA): 172.3 h — +185.5% vs the 12-month average
  4. Porto do Açu - Terminal de Minério (RJ): 58.1 h — +178.6% vs the 12-month average
  5. Terminal UNI-Z (PA): 231.2 h — +171.4% vs the 12-month average

Largest drops in waiting time

  1. Cargill Agrícola S.A. (ETC Miritituba/PA) (PA): 0.0 h — -99.3% vs the 12-month average
  2. Belém (PA): 0.2 h — -96.7% vs the 12-month average
  3. ATEM Manaus (AM): 0.3 h — -89.6% vs the 12-month average
  4. Terbian - Terminal Bianchini (RS): 1.7 h — -82.7% vs the 12-month average
  5. Ciagram Portos e Navegação da Amazônia (AM): 46.6 h — -80.1% vs the 12-month average

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026