Official ANTAQ data up to 02/2026
Waiting time to berth at Administração de Bens de Infraestrutura - ABI (PA) — Liquid and gas bulk
In the 12 months to 02/2026, liquid and gas bulk vessels waited a median of 0.3 h to berth at Administração de Bens de Infraestrutura - ABI (PA); 1 in 10 waited more than 0.7 h (P90). Based on 473 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.
The median wait is 95% below the national median for liquid and gas bulk (5.5 h).
Last 12 months (to 02/2026)
- Waiting time to berth — Median
- 0.3 h
- Waiting time to berth — P90
- 0.7 h
- Berthings
- 473
- Operation
- 3.8 h
| Month | Median | P90 | Berthings |
|---|---|---|---|
| 02/2026 | 0.4 h | 0.7 h | 43 |
| 01/2026 | 0.4 h | 0.8 h | 38 |
| 12/2025 | 0.3 h | 1.0 h | 49 |
| 11/2025 | 0.3 h | 0.5 h | 51 |
| 10/2025 | 0.2 h | 0.6 h | 52 |
| 09/2025 | 0.3 h | 0.5 h | 38 |
| 08/2025 | 0.2 h | 0.5 h | 29 |
| 07/2025 | 0.3 h | 0.5 h | 41 |
| 06/2025 | 0.3 h | 0.5 h | 36 |
| 05/2025 | 0.3 h | 0.7 h | 35 |
| 04/2025 | 0.4 h | 0.8 h | 30 |
| 03/2025 | 0.3 h | 0.5 h | 31 |
How to cite
The data may be reused under the CC BY 4.0 license, citing the source:
Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/administracao-de-bens-de-infraestrutura-abi/granel-liquido
Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026