Official ANTAQ data up to 02/2026

Waiting time to berth at LDC Pederneiras (SP) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 0.0 h to berth at LDC Pederneiras (SP); 1 in 10 waited more than 0.0 h (P90). Based on 807 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 100% below the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
0.0 h
Waiting time to berth — P90
0.0 h
Berthings
807
Operation
4.7 h
Median and P90 wait for dry bulk at LDC Pederneiras, by month
MonthMedianP90Berthings
01/2026insufficient datainsufficient data3
12/20250.0 h0.0 h87
11/20250.0 h0.0 h81
10/20250.0 h0.0 h78
09/20250.0 h0.0 h71
08/20250.0 h0.0 h83
07/20250.0 h0.0 h84
06/20250.0 h0.0 h80
05/20250.0 h0.0 h80
04/20250.0 h0.0 h80
03/20250.0 h0.0 h80
02/20250.0 h0.0 h48

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/ldc-pederneiras/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026