Waiting time to berth at Porto do Açu - Terminal de Minério (RJ) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 30.6 h to berth at Porto do Açu - Terminal de Minério (RJ); 1 in 10 waited more than 114.2 h (P90). Based on 144 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 460% above the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
30.6 h
Waiting time to berth — P90
114.2 h
Berthings
144
Operation
28.4 h
Median and P90 wait for dry bulk at Porto do Açu - Terminal de Minério, by month
MonthMedianP90Berthings
02/202625.9 h191.5 h11
01/202674.0 h116.4 h13
12/202552.4 h95.2 h13
11/202538.6 h141.2 h13
10/202535.8 h64.7 h12
09/202545.3 h86.4 h9
08/202519.0 h52.1 h7
07/202510.9 h41.7 h14
06/202558.1 h129.4 h13
05/202526.9 h72.9 h14
04/20258.2 h164.7 h12
03/202511.2 h77.9 h13

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/porto-do-acu-terminal-de-minerio/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026