Official ANTAQ data up to 02/2026

Waiting time to berth at Rio Grande (RS) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 36.9 h to berth at Rio Grande (RS); 1 in 10 waited more than 187.9 h (P90). Based on 696 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 575% above the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
36.9 h
Waiting time to berth — P90
187.9 h
Berthings
696
Operation
39.1 h
Median and P90 wait for dry bulk at Rio Grande, by month
MonthMedianP90Berthings
02/202637.4 h152.6 h41
01/20268.0 h220.4 h36
12/202555.3 h171.4 h57
11/202517.8 h174.1 h60
10/202552.3 h168.2 h59
09/202579.0 h278.2 h75
08/202519.3 h129.3 h84
07/20259.5 h139.9 h60
06/202552.9 h190.5 h56
05/202528.9 h167.8 h63
04/202553.1 h217.9 h58
03/202537.9 h270.8 h47

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/rio-grande/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026