Official ANTAQ data up to 02/2026
Waiting time to berth at Terminal de Petróleo TPET/TOIL - Açu (RJ) — Liquid and gas bulk
In the 12 months to 02/2026, liquid and gas bulk vessels waited a median of 50.6 h to berth at Terminal de Petróleo TPET/TOIL - Açu (RJ); 1 in 10 waited more than 181.3 h (P90). Based on 423 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.
The median wait is 825% above the national median for liquid and gas bulk (5.5 h).
Last 12 months (to 02/2026)
- Waiting time to berth — Median
- 50.6 h
- Waiting time to berth — P90
- 181.3 h
- Berthings
- 423
- Operation
- 20.3 h
| Month | Median | P90 | Berthings |
|---|---|---|---|
| 02/2026 | 37.6 h | 137.7 h | 38 |
| 01/2026 | 80.1 h | 226.5 h | 47 |
| 12/2025 | 41.2 h | 153.7 h | 38 |
| 11/2025 | 85.8 h | 186.0 h | 30 |
| 10/2025 | 72.8 h | 214.5 h | 35 |
| 09/2025 | 61.1 h | 189.6 h | 34 |
| 08/2025 | 77.5 h | 144.4 h | 47 |
| 07/2025 | 36.2 h | 160.0 h | 30 |
| 06/2025 | 57.5 h | 202.1 h | 39 |
| 05/2025 | 19.7 h | 166.6 h | 28 |
| 04/2025 | 19.2 h | 179.7 h | 28 |
| 03/2025 | 20.2 h | 107.6 h | 29 |
How to cite
The data may be reused under the CC BY 4.0 license, citing the source:
Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/terminal-de-petroleo-tpet-toil-acu/granel-liquido
Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026