Official ANTAQ data up to 02/2026

Waiting time to berth at Terminal de Uso Privado de Macau (RN) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 0.1 h to berth at Terminal de Uso Privado de Macau (RN); 1 in 10 waited more than 0.1 h (P90). Based on 394 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 99% below the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
0.1 h
Waiting time to berth — P90
0.1 h
Berthings
394
Operation
4.4 h
Median and P90 wait for dry bulk at Terminal de Uso Privado de Macau, by month
MonthMedianP90Berthings
02/20260.1 h0.1 h42
01/20260.1 h0.1 h51
12/20250.1 h0.1 h23
11/20250.1 h0.1 h44
10/20250.1 h0.1 h31
09/20250.1 h0.1 h27
08/20250.1 h0.1 h19
07/20250.1 h0.1 h36
06/20250.1 h0.1 h20
05/20250.1 h0.1 h22
04/20250.1 h0.1 h39
03/20250.1 h0.1 h40

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/terminal-de-uso-privado-de-macau/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026