Waiting time to berth at Terminal Fluvial de Juruti (PA) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 1.8 h to berth at Terminal Fluvial de Juruti (PA); 1 in 10 waited more than 3.4 h (P90). Based on 139 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 67% below the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
1.8 h
Waiting time to berth — P90
3.4 h
Berthings
139
Operation
24.4 h
Median and P90 wait for dry bulk at Terminal Fluvial de Juruti, by month
MonthMedianP90Berthings
02/20262.1 h3.4 h12
01/20261.8 h10.4 h12
12/20252.0 h6.3 h12
11/20251.6 h2.2 h12
10/20251.9 h2.2 h12
09/20251.7 h2.1 h13
08/20251.6 h2.2 h12
07/20251.7 h2.3 h10
06/20251.7 h1.8 h11
05/20252.0 h14.2 h12
04/20251.9 h2.2 h11
03/20251.9 h8.1 h10

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/terminal-fluvial-de-juruti/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026