Official ANTAQ data up to 02/2026
Waiting time to berth at Terminal PVH - II (RO) — Dry bulk
In the 12 months to 02/2026, dry bulk vessels waited a median of 53.5 h to berth at Terminal PVH - II (RO); 1 in 10 waited more than 113.3 h (P90). Based on 138 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.
The median wait is 879% above the national median for dry bulk (5.5 h).
Last 12 months (to 02/2026)
- Waiting time to berth — Median
- 53.5 h
- Waiting time to berth — P90
- 113.3 h
- Berthings
- 138
- Operation
- 2.5 h
| Month | Median | P90 | Berthings |
|---|---|---|---|
| 02/2026 | 47.9 h | 100.2 h | 87 |
| 01/2026 | 77.6 h | 179.7 h | 51 |