Official ANTAQ data up to 02/2026

Waiting time to berth at Porto Sudeste do Brasil S/A (RJ) — Dry bulk

In the 12 months to 02/2026, dry bulk vessels waited a median of 46.2 h to berth at Porto Sudeste do Brasil S/A (RJ); 1 in 10 waited more than 149.6 h (P90). Based on 152 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.

The median wait is 745% above the national median for dry bulk (5.5 h).

Last 12 months (to 02/2026)

Waiting time to berth — Median
46.2 h
Waiting time to berth — P90
149.6 h
Berthings
152
Operation
43.4 h
Median and P90 wait for dry bulk at Porto Sudeste do Brasil S/A, by month
MonthMedianP90Berthings
02/202648.4 h120.3 h11
01/202619.7 h75.1 h8
12/202530.0 h100.6 h14
11/202574.3 h162.8 h15
10/202520.5 h85.2 h12
09/202525.5 h67.9 h14
08/202547.8 h105.9 h19
07/202523.7 h148.6 h7
06/202555.5 h189.5 h13
05/202584.8 h157.2 h12
04/2025116.4 h203.1 h13
03/202545.7 h130.3 h14

How to cite

The data may be reused under the CC BY 4.0 license, citing the source:

Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/porto-sudeste-do-brasil-s-a/granel-solido

Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026