Official ANTAQ data up to 02/2026
Waiting time to berth at Porto Sudeste do Brasil S/A (RJ) — Dry bulk
In the 12 months to 02/2026, dry bulk vessels waited a median of 46.2 h to berth at Porto Sudeste do Brasil S/A (RJ); 1 in 10 waited more than 149.6 h (P90). Based on 152 recorded berthings. Source: ANTAQ — Estatístico Aquaviário.
The median wait is 745% above the national median for dry bulk (5.5 h).
Last 12 months (to 02/2026)
- Waiting time to berth — Median
- 46.2 h
- Waiting time to berth — P90
- 149.6 h
- Berthings
- 152
- Operation
- 43.4 h
| Month | Median | P90 | Berthings |
|---|---|---|---|
| 02/2026 | 48.4 h | 120.3 h | 11 |
| 01/2026 | 19.7 h | 75.1 h | 8 |
| 12/2025 | 30.0 h | 100.6 h | 14 |
| 11/2025 | 74.3 h | 162.8 h | 15 |
| 10/2025 | 20.5 h | 85.2 h | 12 |
| 09/2025 | 25.5 h | 67.9 h | 14 |
| 08/2025 | 47.8 h | 105.9 h | 19 |
| 07/2025 | 23.7 h | 148.6 h | 7 |
| 06/2025 | 55.5 h | 189.5 h | 13 |
| 05/2025 | 84.8 h | 157.2 h | 12 |
| 04/2025 | 116.4 h | 203.1 h | 13 |
| 03/2025 | 45.7 h | 130.3 h | 14 |
How to cite
The data may be reused under the CC BY 4.0 license, citing the source:
Vessel Planner (LOGMAPS), based on ANTAQ data — Estatístico Aquaviário, 02/2026. https://logmaps-vessel-planner-prd.web.app/en/portos/porto-sudeste-do-brasil-s-a/granel-solido
Source: ANTAQ — Estatístico Aquaviário, data up to 02/2026